You are the grid operator. Wire substations to the city, balance load against generation in real time, and keep the lights on through heat waves, storms and the 6 PM surge.
Progress saves on this device. P pause M mute R restart
Select level
Grid missions
Control room manual
How to play
Wire it up: drag from a glowing substation terminal to a neighborhood, or tap the terminal then the neighborhood. Every home needs exactly one feeder.
Watch the load: green is safe, amber is close, red flashing means the breaker will trip. A feeder trips when its load passes its rating.
Breakers: tap a tripped breaker to reset it. If the main breaker trips, the whole substation goes dark until you shed load and reset it.
Balance generation: solar sleeps at night and clouds cut it, wind gusts and calms, gas is yours to crank with + and -, nuclear just hums.
Survive the day: keep served energy above 85 percent to clear the level. Shed a neighborhood (tap it) as a last resort, it counts as managed, not a blackout.
Storms snap lines: rewire fast. Faults need a crew, wait for the all clear before resetting.
Level 1 of 20
First Light
New on this grid:
24 hour demand curve. Red ticks: storms. Grey bands: clouds.
Paused
Control room holding
The grid is frozen. Take your time, operator.
Shift complete
Level complete
Grid event
⚠ Shift failed
All 20 levels cleared
🏆 Grid Master
You held the whole grid through the Polar Vortex. The city sleeps warm tonight because of you.