Heritage roof thatching craft. 20 contracts from cottage eaves to church spires.
Achievements
Choose a contract
Finish a contract to unlock the next one.
How to thatch
Laying courses (touch)
Work from the eaves up to the ridge. Drag the glowing course up or down to set its overlap on the course below, watch the overlap gauge, then tap the chunky SET COURSE button when the needle sits in the green. Every material needs its own minimum overlap.
Materials and pitch
Water reed needs 7 in overlap and a 45 to 60 degree pitch. Wheat straw needs 10 in and 45 to 55 degrees. Sedge needs 9 in and 45 to 60 degrees. Shallow pitch lets rain drive under the coat.
Spars and wind
Tap a laid cell to drive a hazel spar. Red hatched wind uplift zones at eaves, ridge and gable edges need the full pattern: under fixed thatch lifts in a gale and leaks.
Netting, moss, repairs
Drag to paint wire netting against birds until coverage hits the target. Tap moss patches to treat them or they rot the coat. On storm callouts, tap each damaged hole to patch it before the next storm.
Listed buildings
Heritage roofs demand like for like material, the original technique, and no visible wire net. The conservation officer refuses consent if you break the rules.
Keyboard
P pause, M mute, Enter set course / confirm.
Drag the glowing course to set overlap, keep the needle green, then tap SET COURSE. Tap glowing cells to drive spars in red wind zones. Drag to paint wire netting. Tap moss to treat it, tap storm holes to patch them. Then TEST ROOF.
APPRENTICE
First Course
Contract 1 of 20
CONTRACT COMPLETE
First Course
★★★
CONTRACT FAILED
Leaking Roof
ALL CONTRACTS DONE
MASTER THATCHER
Twenty roofs watertight, from cottage eaves to the church spire. The village is dry because of you.